色色毛片av,多姿,性爱自拍网,亚洲色图,熟女乱伦,色色先锋小说aⅴ

從事濟南彩鋼板房,彩鋼瓦,復合板,巖棉板,C型鋼,濟南鋼結構的廠家
服務電話:0531-83658718
熱門搜索:濟南方管,濟南彩鋼瓦,濟南巖棉板,濟南型鋼,濟南樓承板,濟南泡沫復合板
公司動態 所在位置- 首頁-新聞中心-公司動態樓承板工程進行時的各項注意事項

樓承板工程進行時的各項注意事項

發布時間:2022-10-13 來源:http://www.chinabjzzz.com/

在樓承板工程日常使用中,樓承板也需要好好的進行維護保養注意各種事項,下面濟南樓承板廠家為您分享。
In the daily use of the floor bearing plate project, the floor bearing plate also needs to be well maintained and attention should be paid to various matters. Now, Jinan floor bearing plate manufacturer will share with you.
要注意樓承板的保護,屋頂的安裝和保護一般在晴天,安排安裝人員對有缺陷的鎖縫、釘子等部位進行保護和加固。需要時更換,易積水的地方應密封。邊緣面板需要更正。
Attention shall be paid to the protection of the floor bearing plate. The installation and protection of the roof are generally in sunny days. The installation personnel shall be arranged to protect and reinforce the defective lock seams, nails and other parts. Replace when necessary, and seal the places where water is easy to accumulate. The edge panel needs to be corrected.
彩鋼板屋面的防漏效果很大程度上取決于安裝單位的現場施工經驗業=性。技術人員要了解裝配式房屋的設計和結構,不同材料的施工工藝和安裝步驟,以及各種防水材料技術的優缺點和實際使用的關鍵,取長補短,優化組合,并根據現場工程實踐制定合理的施工方案及相關技術措施。
The leakage prevention effect of color steel plate roof largely depends on the on-site construction experience of the installation unit. Technicians should understand the design and structure of prefabricated houses, the construction process and installation steps of different materials, as well as the advantages and disadvantages of various waterproof materials and the key to actual use, learn from each other, optimize the combination, and formulate reasonable construction plans and relevant technical measures according to the site engineering practice.
安裝完成后,查看整個安裝的屋頂。如有缺陷,及時修補漏水處,清理屋面施工安裝現場,并通知相關人員檢查。檢查方法包括沖洗測試或雨后檢查。在保證封閉式樓承板的室內承載和傳動縱向空間時,應提前防止結構過度變形,防止壓桿變形,保證室內結構的整體穩定性。
When the installation is complete, view the entire installed roof. If there is any defect, repair the leakage in time, clean the roof construction and installation site, and notify relevant personnel to inspect. Inspection methods include flushing test or inspection after rain. When ensuring the indoor bearing and driving longitudinal space of the closed floor bearing plate, excessive deformation of the structure and deformation of the compression bar shall be prevented in advance to ensure the overall stability of the indoor structure.
在各跨柱與車間立柱之間的測量段應設置穩定的柱間支撐系統,并根據車間結構、車間行車設置、振動設備、車間跨度、高度、測量段長度等條件。
The measuring section between each span column and workshop column shall be provided with a stable inter column support system according to the workshop structure, workshop crane setting, vibration equipment, workshop span, height, length of measuring section and other conditions.
濟南樓承板
下柱支撐的位置是決定廠房縱向結構變形方向的主要因素,需要測量受力大小。下柱支撐應盡可能設置在測量斷面之間,使行車梁等縱向結構應力隨測量變化,觀察室內斷面兩端的舒適彈性。
The position of the lower column support is the main factor determining the deformation direction of the longitudinal structure of the plant, and the force magnitude needs to be measured. The lower column support shall be set between the measuring sections as far as possible, so that the longitudinal structural stress of the driving beam changes with the measurement, and observe the comfort and elasticity of both ends of the indoor section.
樓承板露天存放時,應稍微傾斜放置(角度不宜過大),使雨雪等氣候濕氣盡快從板的縫隙中流出,當成捆的樓板與地面接觸時,應提供墊板;捆扎堆放時,兩捆之間應設置墊料,堆垛高度不得超過三捆。
When the floor bearing plate is stored in the open air, it should be placed at a slight angle (the angle should not be too large), so that the rain and snow and other weather moisture can flow out from the gap of the plate as soon as possible. When the bundled floor is in contact with the ground, a backing plate should be provided; When binding and stacking, padding shall be set between two bundles, and the stacking height shall not exceed three bundles.
樓承板露天存放時,如不能短時間使用,應盡量遮蓋保護產品。另外,樓承板裝置的施工速度要快,從搬入入庫到混凝土澆筑完成不超過兩周。當樓板需要用軟吊索安裝在高處時,需要將樓板吊到高處,然后進行正常作業。使用軟吊索,使樓板的質量不會被吊索損壞。
When the floor bearing plate is stored in the open air, if it cannot be used for a short time, the product shall be covered as much as possible. In addition, the construction speed of floor bearing plate device shall be fast, and it shall not exceed two weeks from moving into warehouse to the completion of concrete pouring. When the floor slab needs to be installed at a high place with a soft sling, the floor slab needs to be lifted to a high place, and then normal operation can be carried out. Use soft slings so that the quality of the floor will not be damaged by the slings.
以上是給大家分享的內容。如果您有任何疑問,可以隨時來我們網站http://www.chinabjzzz.com進行咨詢了解!
The above is for everyone to share. If you have any questions, you can come to our website at any time http://www.chinabjzzz.com Ask about it!